Frame day is always a good one. After weeks of earthworks, drainage and getting the slab right, this is where a job suddenly looks like a building. The crane was on site first thing and the main portals were up and plumbed by lunch.
This one’s a big clearspan workshop on a lifestyle block out the back of Kaukapakapa. Because we’d sorted the pad and the foundations ourselves, the steel went together without a hitch – no waiting on anyone else, no surprises in the ground. Cladding and roller doors go on next.
From the ground up – earthworks, the boxed slab, and drainage all done in-house before the steel arrived.

